← All tools
EDTOOLKITS GUIDES

Calendar Splitting: Keep Crossing Events Intact

By Team Edtoolkits · Calendar

Group explicit occurrences by their starting month or source without assuming events are clipped at month boundaries.

Use the guide alongside the working tool.

Open Calendar Splitter →

Try the local sample

{
  "start": "2026-11-01",
  "end": "2026-12-31",
  "zone": "UTC",
  "weekends": "0,6",
  "holidays": "",
  "group": "Month"
}

Split calendar occurrences into month or source groups and download a ZIP. Selected occurrences are copied into complete standalone ICS files. A multi-day event belongs to its start-date month. Month grouping uses the chosen display zone. A crossing event remains intact; no date-only clipping.

A comparison to try

Use an event starting on January 31 and ending on February 2, then split by month. It belongs to January's start-date group and remains a complete event in that file.

Read the result

Grouping chooses which standalone file receives an occurrence. It does not divide duration between months or rewrite the event to fit a page. Month assignment uses the selected display timezone, so a timed event near midnight can group differently after a zone change.

A mistake to avoid

The output contains bounded explicit occurrences rather than an ongoing synchronized series. Review each file's range and content before import, especially private notes. Unsupported source recurrence is rejected; splitting is not a way to recover unsupported calendar features silently.

Prepare the calendar

Split calendar occurrences into month or source groups and download a ZIP.

Use the sample to inspect the exact workflow. Set the planning range and replace the demonstration entries with your own dates.

Check the assumptions

Selected occurrences are copied into complete standalone ICS files. A multi-day event belongs to its start-date month. Month grouping uses the chosen display zone. A crossing event remains intact; no date-only clipping.

Dates are inclusive in planning inputs unless labeled exclusive. Timed events require a valid IANA timezone; ambiguous daylight-saving times are rejected.

Keep and share the result

Review warnings and totals, then export the supported ICS, CSV, JSON or report formats. Exports contain the chosen data, so review sensitive names and notes before sharing.

No calendar account is connected and no reminder is scheduled by this website. Import the ICS file explicitly into a calendar app; save a JSON draft if you want to continue editing later.

Ready to apply this workflow?

Try Calendar Splitter →

Explore a related workflow

All practical guides →

Found unclear instructions or an unexpected result? Contact Team Edtoolkits.

YOUR BROWSER, YOUR CHOICE